![]() ![]() ![]() Spaces about Electrical Equipment over 1,000V, Nominal Spaces about Electrical Equipment 600V, Nominal/ Less NOTE: While the followings is a list of key zoning, code and other regulations that may be relevant in the project design, it does not cover ALL applicable regulations.Īpproval of Electrical Materials, Equipment and Installations In addition, all work under the project must conform to the NYC Construction Codes, such as the Administrative Code, Building Code, Energy Conservation Code, Fuel Gas Code, Mechanical Code and Plumbing Code.ĭepending on the location of work being performed, you may also need to comply with other city agencies requirements, such as but not limited to the Fire Department (FDNY), Department of Environmental Protection (DEP), Department of Transportation (DOT), and Landmark Preservation Commission (LPC).Įlectrical work that requires submission of electrical plans for review and approval by DOB, shall comply with the following code and regulations that apply. ![]() Design Professional Requirements: Electrical Systems Applicability of CodeĮlectrical work, new installation or modifications to existing systems, must comply with the 2011 NYC Electrical Code, which includes both administrative requirements and the 2008 NEC amendments (NFPA 70). ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |